Proven – acb operation below dew point
Project-specific testing has been completed at TROX laboratory in Malaysia, proving that – with appropriate mitigation strategies in place – TROX Active Chilled Beams (ACB’s) can operate effectively in buildings with operable facades.



Leave a Reply
Want to join the discussion?Feel free to contribute!